Skid design – POU 6 ton – DNV 2.7.3
Il cliente ci ha commissionato la progettazione e il calcolo di una Power Offshore Unit, according to DNV 2.7.3. The calculation involved several scenarios: lifting with ropes, lifting with forks, the hypothesis of side impact. The analysis was carried out with the FEM methodology.